About this project
The activities consisted of:
- Deepening the southern access channel of the Port of Rauma.
- The dredging material then had to be dumped (pumped) in a basin of approximately 37 ha. This basin had a maximum depth of -7 meters, which could be filled to a maximum of +2 meters.
- Monitoring the work (survey)
- Plough work/bed levelling.