Suriname River Dredging Project

Location Suriname river, Paramaribo
Client Ministry of Public Works of the Republic of Suriname
Period 2021-2023
Equipment used Delta Queen I
Kabalebo
Lesse
Parana
Saramacca
Argus 1
Dredging volume Estimated volume : 420.000 m3

About the project

The project is carried out by the Joint Venture Baggerbedrijf De Boer B.V. – Boskalis B .V.

The Suriname River is the main shipping route to the port of Paramaribo. Due to the silting, the draft is limited and ships cannot enter fully loaded or they are dependent on the tide. For safe navigation of ships and for a major economic importance, especially for the oil and gas industry, the access channel will have to be deepened. To achieve this, the first phase of the contract consists of:

  • Surveying the entire route over a length of 68 km (pre-dredge survey/measurement)
  • Deepening the access channel to -4.75 meters CD
  • Widening the access channel to a minimum of 70m and 90m
  • Measuring the entire route over a length of 68 km (post-dredge survey)
  • After deepening the access channel, maintenance dredging will be carried out over a period of two years to maintain the depth

     

More photos coming soon

Additional work Pumping Station near Kleine Waterstraat