Go to content

Maintenance dredging (bucket dredger) river Rhine Duisburg

Location Duisburg, Germany
Client WSA Duisburg-Rhein
Period 2019
Equipment used Aalscholver
DD512 and DD517
Hugo
Dredging volume Approx. 135.000 m3

About this project

Dredging in the area of the WSA Duisburg-Rhein from km 759,700 to 865,500

Maintenance dredging with a bucket dredger on the river Rhine. The aim was to dredge the shallows from the river. We had to deliver very flat work here and accurately cut the trajectory to a depth with a maximum tolerance of 5 cm.

The implementation of this project was to take place in 2018 and 2019, but due to the increasing dry periods, the rivers in the Netherlands and Germany were faced with extremely low water levels. The drought in 2018 lasted seven months. At the beginning of 2019, the Aalscholver could finally leave for Duisburg.


Watch the video to learn more about this project

Video project Duisburg (Dutch spoken)

Photos of the project

Read more about the used equipment

Aalscholver
DD512 and DD517
Hugo